The City has received an application by Insite Property Group to develop a warehouse and distribution facility on a 19 acre site located at the southwest corner of Beverly Boulevard and Interstate 605.  The applicant proposes the construction of an industrial warehouse, distribution and office facility totaling 357,903 square feet and a 2,500 square-foot print shop facility; both facilities include surface parking, landscaping, and other ancillary improvements.  West of the site is an RV storage and public utility facility and to the south is a small residential neighborhood in unincorporated County. 

The concrete tilt-up warehouse and distribution building would include a variety of contemporary architectural variations and features, including varying painted surfaces, a clear anodized aluminum glazing system, metal accent fins, metal cladding, and perforated metal accent screens. The warehouse and distribution facility would also include a total of 52 loading docks and 2 grade doors on the western and southern sides of the building.  The warehousing/distribution building would operate 24 hours a day, 7 days a week.

On October 10, 2022 the Planning Commission recommended approval to the City Council.   A City Council meeting will be held on the item to determine if the project will be approved or not approved.

City Council Public Hearing

Date:           Tuesday, October 25, 2022

Time:          6 P.M.

WHERE:      City Council Chambers

6615 Passons Boulevard
Pico Rivera, CA 90660

Copies of the staff report may be found here

A copy of the traffic study may be found here

The IS/MND may be reviewed at this link: Initial Study/Mitigated Negative Declaration

APPENDICES

Appendix A: Air Quality/Greenhouse Gas/Energy Data

Appendix B: Biological Resources Analysis

Appendix C: Cultural Assessment

Appendix D: Geotechnical Analysis

Appendix E: Noise Data

Appendix F: Vehicle Miles Traveled Memorandum/Traffic Operations Report

Appendix G: Health Risk Data

Appendix H: Phase I Environmental Site Assessment

Plans and Renderings of the project may be found by clicking on this link.  

Please direct your comments and/or any questions to the following City contact:
 Hector Hernandez – Senior Planner
(562) 801-4340
hhernandez@pico-rivera.org

Comments are closed.

Close Search Window